Opportunity After 22 years of operations, Britannia Landfill closed in 2002 after having received more than 10 million tonnes of waste. Rehabilitation of the site began in 1999 when the Region opened a golf course on the former landfill, but it continued to release greenhouse gases—including methane and carbon dioxide— as waste slowly decomposed. The Regional Municipality of Peel (Mississauga, Bra

Project Information FAQ

Project Information

5 Q
The project “Britannia Landfill Gas to Electricity Project” is an infrastructure initiative in the Government sector, located in Mississauga, Ontario, Canada. Taiyo aggregates data on it from P3Spectrum, Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

operational

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Opportunity After 22 years of operations, Britannia Landfill closed in 2002 after having received more than 10 million tonnes of waste. Rehabilitation of the site began in 1999 when the Region opened a golf course on the former landfill, but it continued to release greenhouse gases—including methane and carbon dioxide— as waste slowly decomposed. The Regional Municipality of Peel (Mississauga, Brampton and Caledon) decided to seek a specialized partner to exploit the gas, generating electricity while also reducing emissions. Challenges IGRS had to find a purchaser with a constant demand for electricity that was willing to commit to a long-term fixed price and pay a premium for green power. Situating a plant in an urban setting was a delicate process and involved a learning curve with the local utility. Innovations IGSR took responsibility for the landfill gas collection system expansion, compression and treatment, and the power generation facility. The Region of Peel backstops the power price under a long-term contract. This creates a risk/reward relationship where IGRS assumed the risk for the capital costs, the operating costs and the equipment downtime in exchange for the electricity sales revenue. The Region of Peel assumed the market risk for green power, while reaping the benefits of potential electricity savings and the expanded landfill gas collection system and its environmental rewards, including odour control. The project generates electricity where there was previously no capacity. The expanded landfill collection system pays for capital and operating costs, while the Region’s long-term commitment to power sales helped IGRS obtain financing. Results Twenty-five wells collect approximately 2,500 cubic feet of gas per minute and 8,000 metres of pipeline deliver it to the electricity generation facility which was built and located off-site. The plant consists of gas processing equipment and three reciprocating engines with a total generating capacity of approximately 5 megawatts of power. The facility destroys 250,000 tonnes of carbon dioxide equivalent annually that would otherwise vent into the environment. Converting landfill gas into energy is particularly important as it reduces venting of methane—a greenhouse gas with 21 times the impact of carbon dioxide— into the atmosphere. Locating the power plant in a heavily urbanized area brings intrinsic benefits to the community. Localized power distribution is more efficient with less power lost in transmission. Having multiple power sources also provides a higher degree of reliability so customers are less likely to suffer power failures.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data