Broadcasting Road Storm Sewer Replacement
Closed · Pennsylvania · Last reported Oct 2025
Source: Dodge
consists of furnishing all material, labor, equipment and appurtenances for the replacement of existing storm sewer pipe within Broadcasting Road between North Meridian Boulevard and 222. Approximately 420 of existing 30 CMP will be replaced with new 30 HDPE pipe, and approximately 130 of existing 30 CMP will be replaced with 30 SDR-26 pipe. The project will also include the following: 18 vertical
- Status
- Closed
- Sector
- Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Cement, Government, Manufacturing (Industrial)
- Location
- Spring Township, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Broadcasting Road Storm Sewer Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | consists of furnishing all material, labor, equipment and appurtenances for the replacement of existing storm sewer pipe within Broadcasting Road between North Meridian Boulevard and 222. Approximately 420 of existing 30 CMP will be replaced with new 30 HDPE pipe, and approximately 130 of existing 30 CMP will be replaced with 30 SDR-26 pipe. The project will also include the following: 18 vertical concrete curb replacement (555 ); full depth pavement restoration (485 SY); 1.5 depth milling (8... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Spring Township |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Cement, Government, Manufacturing (Industrial) |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
