logo
ProjectCompleted

Broadway Blvd - Grand Falls

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

The installation of a new storm sewer system will diminish the impact of extreme weather events, such as heavy rainfalls, by alleviating the loading on the sanitary sewer system. It will also reduce erosion by replacing two problematic outfalls to the Saint John River. Existing catch basin connections to the sanitary sewer line will be removed and connected to the new storm sewer line. The propose

Status
Closed
Sector
Cement, Water Supply and Storage, Waste Processing and Treatment, Road, Government
Location
New Brunswick, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Broadway Blvd - Grand Falls

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Broadway Blvd - Grand Falls” is an infrastructure initiative in the Cement sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The installation of a new storm sewer system will diminish the impact of extreme weather events, such as heavy rainfalls, by alleviating the loading on the sanitary sewer system. It will also reduce erosion by replacing two problematic outfalls to the Saint John River. Existing catch basin connections to the sanitary sewer line will be removed and connected to the new storm sewer line. The proposed project consists of upgrading the underground infrastructures of the Broadway Boulevard in Grand Falls, NB. The main purpose of the project is to continue the installation of a new storm sewer system. This will alleviate the sanitary sewer system loading, therefore reducing the load on the waste water treatment plant, reducing downstream sanitary sewage pumping station overflow events and mitigating the adverse effects of natural hazards on public properties. The works involves the supply and installation of storm sewer collection system components, the replacement of existing sanitary sewage system components, the replacement of existing water distribution system components, supply and installation of new water distribution system components, roadways backfilling, reinstatement of sidewalks, the supply and placement of asphalt concrete and site restoration. During heavy rainfalls, the existing system is not capable of handling the volume of surface water being collected, thus causing sewage backup and damages in some public properties. Contributing to the problem is the fact that only a combined sewage collecting system is present in this section of the town, therefore, the majority of the collected storm sewage flows are directed to the combined sewage collecting system. This situation has a direct impact on the Town’s waste water treatment system and on damages to public properties during heavy rainfall events. The installation of the new system will mitigate the effects of natural hazards.

Original sector

Drinking Water and Wastewater

Budget

Location

Country

Canada

State

New Brunswick

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Cement, Water Supply and Storage, Waste Processing and Treatment, Road, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project