Broadway Pier Port Pavilion Int & Ext Painting
Closed · California · Last reported Feb 2025
Source: Dodge
In accordance with Contract Documents, the Contractor shall furnish all labor, materials, equipment, supplies, transportation, and disposal as necessary to complete the construction of Interior and Exterior Painting at Broadway Pier Port Pavilion, San Diego, CA. 2. Separate bid schedules have been provided to separate the work between the Exterior Painting of Exposed Structural Steel (BASE BID SCH
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Government, Seaport, Manufacturing (Industrial), Commercial, Metal
- Location
- Lincoln Acres, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Broadway Pier Port Pavilion Int & Ext Painting
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In accordance with Contract Documents, the Contractor shall furnish all labor, materials, equipment, supplies, transportation, and disposal as necessary to complete the construction of Interior and Exterior Painting at Broadway Pier Port Pavilion, San Diego, CA. 2. Separate bid schedules have been provided to separate the work between the Exterior Painting of Exposed Structural Steel (BASE BID SCHEDULE A), Interior Painting of Baggage Area (ADDITIVE BID SCHEDULE B), Interior Painting of PAX W... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Lincoln Acres |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Government, Seaport, Manufacturing (Industrial), Commercial, Metal |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
