logo

Broadway WWTP Plant Rehabilitation

Bid results · Texas · Last reported Mar 2024

Source: Dodge USA

Project
Bid Results

The project scope of work includes: Demolish the existing odor control system for the Resaca Lift Station. Install a new biological tower-type odor control system in place of the existing system. Demolish, modify, and replace portions of the programmable logic controller (PLC) system in the Resaca Lift Station electrical building. Demolish and replace instrumentation at the Resaca Lift Station. Co

Status
Closed
Sector
Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road, Government
Location
Corpus Christi, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Broadway WWTP Plant Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Broadway WWTP Plant Rehabilitation” is an infrastructure initiative in the Commercial sector, located in Corpus Christi, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project scope of work includes: Demolish the existing odor control system for the Resaca Lift Station. Install a new biological tower-type odor control system in place of the existing system. Demolish, modify, and replace portions of the programmable logic controller (PLC) system in the Resaca Lift Station electrical building. Demolish and replace instrumentation at the Resaca Lift Station. Construct a new septage receiving station north of the Aeration Basins. Demolish the existing septa...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Corpus Christi

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road, Government

Article published date

2024-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project