logo

Brock Trail improvements

Sector: Solar • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The scope of the project includes work on two segments of the Brock Trail totaling approximately 1 km, and will involve a trail extension, trail reconstruction, benches, signage, solar lighting, and waste disposal receptacles. A new bridge and a replacement bridge will also be completed to connect sections of the trail, but are not a part of the eligible project. The first segment is located betw

Project Information FAQ

Project Information

4 Q
The project “Brock Trail improvements” is an infrastructure initiative in the Solar sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The scope of the project includes work on two segments of the Brock Trail totaling approximately 1 km, and will involve a trail extension, trail reconstruction, benches, signage, solar lighting, and waste disposal receptacles. A new bridge and a replacement bridge will also be completed to connect sections of the trail, but are not a part of the eligible project. The first segment is located between Brock and Perth Streets, will remove the existing asphalt and reconstruct the trail with 3m wide asphalt surface to allow safe travel in both directions for both pedestrians and cyclists, and mobility devices on the trail. The project also includes the addition of solar lights, benches, refuse disposal units and wayfinding signage. The Central Avenue segment includes the redesign of the Brock trail section providing new connections to Central Ave. and Front Ave. This will shift the trail to the east side of Buell’s Creek to allow for a widening and regrading of these sections and shifting the trail away from the existing City parking lot so that the trail users are no longer sharing the roadway with cars at the trail entrance. The scope also includes installing benches and wayfinding signage. A new bridge will also be installed to add a crossing over Buell’s Creek south of Central Avenue, and a bridge replacement of the existing bridge north of Front Avenue, however, these bridges are not part of the eligible project

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data