Brock Trail improvements
Sector: Solar • Location: Ontario, Canada
Source: Infrastructure Canada
The scope of the project includes work on two segments of the Brock Trail totaling approximately 1 km, and will involve a trail extension, trail reconstruction, benches, signage, solar lighting, and waste disposal receptacles. A new bridge and a replacement bridge will also be completed to connect sections of the trail, but are not a part of the eligible project. The first segment is located betw
- Status
- Closed
- Sector
- Solar, Bridge, Automotive, Car parking, Road, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Brock Trail improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of the project includes work on two segments of the Brock Trail totaling approximately 1 km, and will involve a trail extension, trail reconstruction, benches, signage, solar lighting, and waste disposal receptacles. A new bridge and a replacement bridge will also be completed to connect sections of the trail, but are not a part of the eligible project. The first segment is located between Brock and Perth Streets, will remove the existing asphalt and reconstruct the trail with 3m wide asphalt surface to allow safe travel in both directions for both pedestrians and cyclists, and mobility devices on the trail. The project also includes the addition of solar lights, benches, refuse disposal units and wayfinding signage. The Central Avenue segment includes the redesign of the Brock trail section providing new connections to Central Ave. and Front Ave. This will shift the trail to the east side of Buell’s Creek to allow for a widening and regrading of these sections and shifting the trail away from the existing City parking lot so that the trail users are no longer sharing the roadway with cars at the trail entrance. The scope also includes installing benches and wayfinding signage. A new bridge will also be installed to add a crossing over Buell’s Creek south of Central Avenue, and a bridge replacement of the existing bridge north of Front Avenue, however, these bridges are not part of the eligible project |
Original sector | Active Transportation |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Solar, Bridge, Automotive, Car parking, Road, Government |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in Canada
- Calgary Board of Education K-4 School Bundle
- Acden Corporate Headquarters and Fleet Facility
- Bluenose Academy
- Brandon - Transit Shelters Lighting Project
- Grand Renewable Energy Park Haldimand County Ontario
- Sheridan College Hazel McCallion Campus (Phase 2)
- Solar System for Community Cultural Complex and Roundhouse
- Sol Aurora Solar Project
