Brock University's Marilyn I. Walker School of Fine and Performing Arts
The status, timeline and source of this project. A free account opens every field.
Source: Bird Construction
Located on a site adjacent to a new performing arts centre, also built by Bird, the Brock University project involved the adaptive re-use of a former 19th century textile mill on St. Paul Street, the Canada Hair Cloth building, as well as the renovation of an adjacent warehouse space. The project scope included the construction of a 2,300 m2 addition to house a theatre with retractable seating, ar
- Status
- Unknown
- Sector
- Commercial, Education, Power Generation (CCGT), Warehouse, Road, Manufacturing (Industrial)
- Location
- Canada
- Updated
- 22 Jul 2026
- Source
- Bird Construction
ConstructChat
Ask ConstructChat about Brock University's Marilyn I. Walker School of Fine and Performing Arts
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | unknown |
Taiyo status | Unknown |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Located on a site adjacent to a new performing arts centre, also built by Bird, the Brock University project involved the adaptive re-use of a former 19th century textile mill on St. Paul Street, the Canada Hair Cloth building, as well as the renovation of an adjacent warehouse space. The project scope included the construction of a 2,300 m2 addition to house a theatre with retractable seating, art gallery, lobby space, study areas, and dressing rooms. The repurposing of the existing five-storey facility required installation of new mechanical and electrical systems, and a clear span to be created on the building’s fourth floor for painting and drawing rooms. Life safety systems were upgraded and acoustic separations were installed. The Bird team reclaimed the existing brick façade, wood flooring, pressed tin ceiling tiles, and fire doors to showcase the building’s heritage. Bird provided over $2 million in cost savings to the client to maintain the project’s budget. This included more than two months of value engineering with revisions to the original helical pile system to a rammed aggregate pier system to ensure the building’s structural integrity would be maintained by modifying soils surrounding the piers, and small modifications such as architectural finishes. |
Location
Country | Canada |
Source
Source reliability | High |
Source | Bird Construction |
URL |
More Details
Record type | Project |
Sector | Commercial, Education, Power Generation (CCGT), Warehouse, Road, Manufacturing (Industrial) |
Article published date | 2023-11-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
