logo

Brock University's Marilyn I. Walker School of Fine and Performing Arts

Sector: Commercial • Location: Canada

Source: Bird Construction

Project
Unknown

Located on a site adjacent to a new performing arts centre, also built by Bird, the Brock University project involved the adaptive re-use of a former 19th century textile mill on St. Paul Street, the Canada Hair Cloth building, as well as the renovation of an adjacent warehouse space. The project scope included the construction of a 2,300 m2 addition to house a theatre with retractable seating, ar

Project Information FAQ

Project Information

3 Q
The project “Brock University's Marilyn I. Walker School of Fine and Performing Arts” is an infrastructure initiative in the Commercial sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Located on a site adjacent to a new performing arts centre, also built by Bird, the Brock University project involved the adaptive re-use of a former 19th century textile mill on St. Paul Street, the Canada Hair Cloth building, as well as the renovation of an adjacent warehouse space. The project scope included the construction of a 2,300 m2 addition to house a theatre with retractable seating, art gallery, lobby space, study areas, and dressing rooms. The repurposing of the existing five-storey facility required installation of new mechanical and electrical systems, and a clear span to be created on the building’s fourth floor for painting and drawing rooms. Life safety systems were upgraded and acoustic separations were installed. The Bird team reclaimed the existing brick façade, wood flooring, pressed tin ceiling tiles, and fire doors to showcase the building’s heritage. Bird provided over $2 million in cost savings to the client to maintain the project’s budget. This included more than two months of value engineering with revisions to the original helical pile system to a rammed aggregate pier system to ensure the building’s structural integrity would be maintained by modifying soils surrounding the piers, and small modifications such as architectural finishes.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data