Brock University's Marilyn I. Walker School of Fine and Performing Arts
Sector: Commercial • Location: Canada
Source: Bird Construction
Located on a site adjacent to a new performing arts centre, also built by Bird, the Brock University project involved the adaptive re-use of a former 19th century textile mill on St. Paul Street, the Canada Hair Cloth building, as well as the renovation of an adjacent warehouse space. The project scope included the construction of a 2,300 m2 addition to house a theatre with retractable seating, ar
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | unknown |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Located on a site adjacent to a new performing arts centre, also built by Bird, the Brock University project involved the adaptive re-use of a former 19th century textile mill on St. Paul Street, the Canada Hair Cloth building, as well as the renovation of an adjacent warehouse space. The project scope included the construction of a 2,300 m2 addition to house a theatre with retractable seating, art gallery, lobby space, study areas, and dressing rooms. The repurposing of the existing five-storey facility required installation of new mechanical and electrical systems, and a clear span to be created on the building’s fourth floor for painting and drawing rooms. Life safety systems were upgraded and acoustic separations were installed. The Bird team reclaimed the existing brick façade, wood flooring, pressed tin ceiling tiles, and fire doors to showcase the building’s heritage. Bird provided over $2 million in cost savings to the client to maintain the project’s budget. This included more than two months of value engineering with revisions to the original helical pile system to a rammed aggregate pier system to ensure the building’s structural integrity would be maintained by modifying soils surrounding the piers, and small modifications such as architectural finishes. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
