Bronte Inner Harbour Berta Point Seawall Replacement
Bidding · Ontario · Last reported Jul 2024
Source: Dodge USA
The existing slope along Berta Point (Bronte Inner Harbour) has experienced erosion due to high water levels. The goal is to stabilize the slope with large boulders and replace the existing docks with a pile supported structure
- Status
- Prospective
- Sector
- Water Supply and Storage, Seaport, Government, Commercial, Manufacturing (Industrial)
- Location
- Oakville, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bronte Inner Harbour Berta Point Seawall Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The existing slope along Berta Point (Bronte Inner Harbour) has experienced erosion due to high water levels. The goal is to stabilize the slope with large boulders and replace the existing docks with a pile supported structure |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Oakville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Seaport, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
