logo
ProjectActive

Brookfield RJ

Sector: Water Supply and Storage • Location: India

Source: International Finance Corporation (IFC)

Brookfield RJ is a group of special purpose vehicles (SPVs) (collectively the Borrower(s)) developing ~560 MWp portfolio of ground mounted open access (OA) solar plants on one contiguous polygon in Bikaner District, Rajasthan (site coordinates: 28°08'04.4N / 73°06'32.4E) supplying power to commercial and industrial (C&I) clients through a long-term power purchase agreement (PPA) and sale of power

Status
Prospective
Sector
Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Warehouse, Wind, Solar, Manufacturing (Industrial), Automotive, Power Generation (CCGT), Commercial, Government
Location
India
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Brookfield RJ

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Brookfield RJ” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Brookfield RJ is a group of special purpose vehicles (SPVs) (collectively the Borrower(s)) developing ~560 MWp portfolio of ground mounted open access (OA) solar plants on one contiguous polygon in Bikaner District, Rajasthan (site coordinates: 28°08'04.4N / 73°06'32.4E) supplying power to commercial and industrial (C&I) clients through a long-term power purchase agreement (PPA) and sale of power on exchange such as Indian Power Exchange (exchange). The SPVs are wholly owned by BGTF Holdings DIFC Limited (the “Sponsor”). BGTF Holdings is 80% held by Brookfield Asset Management, and 20% Brookfield Renewable, collectively referred to as the Sponsors (https://www.Brookfield.com).The total project cost is estimated to be US$ 317 million of INR equivalent. The proposed investment consists of senior debt financing of up to US$95 million in INR equivalent to finance the development of the solar plants. Brookfield Renewable is one of the world’s largest publicly traded platforms for renewable power and decarbonization solutions. Their diversified 21,000 MW capacity portfolio consists of hydroelectric, wind, solar, distributed energy, and sustainable solutions across five continents.At the time of IFC’s appraisal in May 2023, the Sponsor and the Engineering, Procurement and Construction (EPC) contractor (Jakson Green Pvt Ltd. https://www.jakson.com/) were preparing to start construction. Total project capacity will be 560 MW DC / 400 MW AC. Total land area required is approximately 680 hectares. This land is being acquired through voluntary 29-year lease agreements negotiated with over 100 private landowners by renewable energy firm Aright Greentech (https://arightgreentech.com/). Project power will be channelled through the new Bikaner II substation via a 220 kV transmission line (TL) with a length of 10.5 km. Bikaner District is situated in the middle of the Thar desert and has a hot desert climate (Köppen climate classification BWh) in Western India with very little rainfall and extreme temperatures. The closest settlement to the project site is Kawani village situated 600 meters to the northeast where many of the landowners who agreed to lease land to the project live. The land for the project site and transmission line consists mainly of open scrublands and modified rainfed agricultural lands.

Original sector

V-BF - Solar - Renewable Energy Generation

Location

Country

India

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Warehouse, Wind, Solar, Manufacturing (Industrial), Automotive, Power Generation (CCGT), Commercial, Government

Article published date

2025-10-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project