logo

Brookings 5-Megawatt Solar Project

Sector: Solar • Location: Aurora Township, South Dakota, United States of America

Source: Dodge USA

Project
Construction Documents

75 acres of land (use 40 acres initially) - 5 MW alternating current (AC) solar project - Estimated annual generation: 10,995 MWh - Connected to BMU 34th Ave. substation - Expected to be operational for 30+ years

Status
Closed
Sector
Solar, Power Generation (CCGT), Commercial
Location
Aurora Township, South Dakota, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Brookings 5-Megawatt Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Brookings 5-Megawatt Solar Project” is an infrastructure initiative in the Solar sector, located in Aurora Township, South Dakota, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction Documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

75 acres of land (use 40 acres initially) - 5 MW alternating current (AC) solar project - Estimated annual generation: 10,995 MWh - Connected to BMU 34th Ave. substation - Expected to be operational for 30+ years

Budget

Location

Country

United States of America (USA)

State

South Dakota

City

Aurora Township

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Commercial

Article published date

2024-09-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project