Brookings Co Structure & Approach Grading
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Project includes the following Work: Remove in-place 55.5 foot long two-span steel I-beam with a steel deck structure, install new 4- 13 x8 cast-in-place concrete box culvert structure. Work includes earthwork, roadway grading, and installation of cast-in-place concrete box culvert.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Commercial, Waste Processing and Treatment, Metal, Steel
- Location
- Brookings, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Brookings Co Structure & Approach Grading
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: Remove in-place 55.5 foot long two-span steel I-beam with a steel deck structure, install new 4- 13 x8 cast-in-place concrete box culvert structure. Work includes earthwork, roadway grading, and installation of cast-in-place concrete box culvert. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Brookings |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Commercial, Waste Processing and Treatment, Metal, Steel |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
