Brookline High School Tunnel
Sector: Water Supply and Storage • Location: Brookline, Massachusetts, United States of America
Source: Dodge
The Project consists of but not limited to: Project includes work at exterior plaza grade and below-grade interior at basement and hallway areas. Plaza-level Work includes replacement of slab waterproofing system, including removal and replacement of concrete paving, waterproofing membrane, embedded flashings, and brick masonry at slab perimeter. Below-grade work includes repair of water-damaged s
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Tunnel, Cement, Commercial, Government
- Location
- Brookline, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Brookline High School Tunnel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of but not limited to: Project includes work at exterior plaza grade and below-grade interior at basement and hallway areas. Plaza-level Work includes replacement of slab waterproofing system, including removal and replacement of concrete paving, waterproofing membrane, embedded flashings, and brick masonry at slab perimeter. Below-grade work includes repair of water-damaged structural concrete deck and beams and re-routing of MEP and FP system components required to comp... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Brookline |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Tunnel, Cement, Commercial, Government |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
