Brooks Lake Gate No. 2 Replacement
Sector: Manufacturing (Industrial) • Location: Sugar Land, Texas, United States of America
Source: Dodge USA
Remove and replace 108 W x 84 H Hydrogate slide gate and actuator, model HG561. Work includes placement of stop logs stored on-site, dewatering and demucking of the weir structure prior to the gate replacement and removal of stop logs after work is completed. There are three weir structures and all three will need to be dewatered and demucked.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Government, Residential
- Location
- Sugar Land, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Brooks Lake Gate No. 2 Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Remove and replace 108 W x 84 H Hydrogate slide gate and actuator, model HG561. Work includes placement of stop logs stored on-site, dewatering and demucking of the weir structure prior to the gate replacement and removal of stop logs after work is completed. There are three weir structures and all three will need to be dewatered and demucked. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Sugar Land |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Government, Residential |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
