BRT Line 2B Traffic Signal Repair at University and Lynnwood Roads Intersection
Delayed · Gauteng · Last reported Jan 2026
Source: The Citizen
The traffic signals at the busy intersection of University and Lynnwood roads in Brooklyn, Pretoria, have been non-functional since December 19, 2025, due to a power outage linked to construction-related damage during the Bus Rapid Transit (BRT) Line 2B expansion works. Despite power restoration, the signals remain off, posing a serious safety hazard. The metro and BRT contractor have conflicting
- Status
- Failure
- Sector
- Education, Road, Power Generation (CCGT), Mass Transit
- Location
- Pretoria, Gauteng, South Africa
- Updated
- 22 Jul 2026
- Source
- The Citizen
ConstructChat
Ask ConstructChat about BRT Line 2B Traffic Signal Repair at University and Lynnwood Roads Intersection
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The traffic signals at the busy intersection of University and Lynnwood roads in Brooklyn, Pretoria, have been non-functional since December 19, 2025, due to a power outage linked to construction-related damage during the Bus Rapid Transit (BRT) Line 2B expansion works. Despite power restoration, the signals remain off, posing a serious safety hazard. The metro and BRT contractor have conflicting accounts regarding responsibility for the repair. The metro is prioritizing repairs to restore power and ensure safety. |
Original sector | Transport |
Location
Country | South Africa |
State | Gauteng |
City | Pretoria |
Source
Source | The Citizen |
URL |
More Details
Record type | Project |
Sector | Education, Road, Power Generation (CCGT), Mass Transit |
Article published date | 2026-04-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Education projects in South Africa
- South Africa - Corporate Loan to Transnet
- South Africa - Eskom Transmission Improvement Project - Loan
- South Africa - Medupi Power Project
- South Africa - Lesotho Highlands Water Project (LHWP), Phase II
- Johannesburg Landfill Gas to Electricity
- DBSA MUNICIPAL INFRASTRUCTURE LOC
- KwaZulu-Natal Research Institute for Tuberculosis and HIV, Durban
- CPUT Food Technology Complex
