Bruce Nuclear Power Plant (Phase 2)

Sector: Government • Location: Tiverton, Ontario, Canada

Source: P3Spectrum, Canada

Project
Operational

Opportunity In 2003 the Government of Ontario committed to phasing out coal as a power source by 2014. The combination of losing this generating capacity and increased demand made it necessary to refurbish, rebuild or replace 25,000 megawatts of supply. A competitive procurement process resulted in the selection of a Bruce Power—a subsidiary of British Energy— to lease, develop and operate Bruce N

Project Information FAQ

Project Information

5 Q
The project “Bruce Nuclear Power Plant (Phase 2)” is an infrastructure initiative in the Government sector, located in Tiverton, Ontario, Canada. Taiyo aggregates data on it from P3Spectrum, Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

operational

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Opportunity In 2003 the Government of Ontario committed to phasing out coal as a power source by 2014. The combination of losing this generating capacity and increased demand made it necessary to refurbish, rebuild or replace 25,000 megawatts of supply. A competitive procurement process resulted in the selection of a Bruce Power—a subsidiary of British Energy— to lease, develop and operate Bruce Nuclear facility, located on Lake Huron. The project has been called “one of the largest and most complex public-private partnerships in Canada.” Following the release of the Government of Ontario’s Achieving Balance: Ontario’s Long-Term Energy Plan in December 2013, the Government of Ontario and Bruce Power entered into negotiations to refurbish Bruce B Units 5-8. On January 1, 2016 amendments to the agreement came into effect, enabling the company to progress with a series of incremental life-extension investments, including refurbishment. Innovations Bruce Power will bear the risk of delivering the project on-time and on-budget with upside sharing for better than planned performance. As has been the case since 2001, Bruce Power will continue to assume responsibility for operating the site. Bruce Power previously had two partnership structures—Bruce A LP (Bruce A) and Bruce Power LP (Bruce B). As a result of this transaction Bruce Power will move to a single partnership structure. Results Life-extension activities for Units 3-8 will support long-term refurbishments on Unit 6 in 2020, optimizing the operational life of the site and offering significant ratepayer and system benefits. The refurbishment of each unit will add approximately 30 to 35 years of operational life, while other life-extension investments will add a combined 30 reactor years of operational life to the units. The program will secure an estimated 18,000 jobs directly and indirectly from operations, and an additional 3,000 to 5,000 jobs annually throughout the investment program, injecting billions into Ontario’s economy. Bruce Power will continue to provide approximately one-third of its output as flexible generation, allowing the province to permanently balance system needs in a post-coal environment.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data