logo

Bruce Nuclear Power Plant

Sector: Government • Location: Tiverton, Ontario, Canada

Source: P3Spectrum, Canada

Project
Operational

Opportunity In 2003 the Government of Ontario committed to phasing out coal as a power source by 2014. The combination of losing this generating capacity and increased demand made it necessary to refurbish, rebuild or replace 25,000 megawatts of supply. Additionally, the provincial government had split Ontario Hydro into five companies to deregulate the electricity industry including Ontario Power

Project Information FAQ

Project Information

5 Q
The project “Bruce Nuclear Power Plant” is an infrastructure initiative in the Government sector, located in Tiverton, Ontario, Canada. Taiyo aggregates data on it from P3Spectrum, Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

operational

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Opportunity In 2003 the Government of Ontario committed to phasing out coal as a power source by 2014. The combination of losing this generating capacity and increased demand made it necessary to refurbish, rebuild or replace 25,000 megawatts of supply. Additionally, the provincial government had split Ontario Hydro into five companies to deregulate the electricity industry including Ontario Power Generation (OPG), established in 1998.  At the time OPG was supplying 86 per cent of electricity, which was problematic because although wholly owned by the province, it was operating in what was supposed to be a competitive marketplace. As such, OPG chose to decontrol Bruce site A and other assets to make the market more balanced. A competitive procurement process resulted in the selection of a Bruce Power—a subsidiary of British Energy— to lease, develop and operate the nuclear facility. The project has been called “one of the largest and most complex public-private partnerships in Canada.” Challenges  Negotiating the contract was complex because of the industry’s significant safety and environmental rules and stringent licensing requirements. Careful timing and sequenced activities were required to ensure safety during handover of the plants’ operations. More than 90 per cent of the workforce at the facility was unionized and are represented by two unions, which initially campaigned against de-regulating Ontario Hydro. Innovations The first nuclear P3 in Canada introduced union equity participation. Operational and market risks were transferred from the province to Bruce Power. Results The facility is the source of 30 per cent of Ontario's electricity and contributes $960 to $1.2 billion in labour income into the economy annually. OPG shares in financial benefits from performance improvements and is protected by a price floor. Prior to the public-private partnership arrangement with Bruce Power, the province was responsible for all financial risks related to the power system. Since entering the 2000 lease agreement, Bruce Power: Returned Bruce A Units 4 and 3 to the grid in October 2003 and January 2004 respectively through a $725 million investment;  Reached an agreement with the Ontario Power Authority to expand the agreement to invest $4.25 billion in the site, beginning with the restart of Bruce A Units 1 and 2 and following with the refurbishment of Units 3 and 4 ; Expanded the agreement again on August 29, 2007 to include the full refurbishment of Unit 4, at an additional cost of $1 billion; and Announced the total forecasted investment in the refurbishment and restart program of Unit A is now approximately in the range of $5.6 to $5.9 billion.   To read CCPPP's case study of Bruce Power, click here!

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data