logo

Brushy Creek Pump Station Upgrade

Sector: Water Supply and Storage • Location: Easley, South Carolina, United States of America

Source: Dodge

Project
Closed

The project consists of the replacement of three existing pumps / motors and associated control panel at the Brushy Creek Pump Station. Also included is the replacement of existing suction / discharge valves, a comminutor, and a surge relief valve, installation of a new electrical generator and transfer switch, electrical improvements, miscellaneous building improvements, installation of a geomemb

Status
Closed
Sector
Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment
Location
Easley, South Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Brushy Creek Pump Station Upgrade

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Brushy Creek Pump Station Upgrade” is an infrastructure initiative in the Water Supply and Storage sector, located in Easley, South Carolina, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of the replacement of three existing pumps / motors and associated control panel at the Brushy Creek Pump Station. Also included is the replacement of existing suction / discharge valves, a comminutor, and a surge relief valve, installation of a new electrical generator and transfer switch, electrical improvements, miscellaneous building improvements, installation of a geomembrane wetwell cover, site work, bypass pumping, approximately 441 LF of 16-inch forcemain replacem...

Procurement method

Budget

Location

Country

United States of America (USA)

State

South Carolina

City

Easley

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project