logo

BSCPL Aurang Tollway Limited

Sector: Road • Location: India

Source: World Bank Group

Project
Active

On 29th August 2011, the National Highway Authority of India (NHAI) awarded a 28-year concession (including construction period of 910 days) to BSCPL Infrastructure Limited for the strengthening, improvement, 4-laning, operation and maintenance, and tolling of 150.4kms of Chattisgarh/Orissa border-Aurang section from KM88.00 to KM239.00 on NH-6 in the State of Chhattisgarh.

Under the contract, BS

Project Information FAQ

Project Information

4 Q
The project “BSCPL Aurang Tollway Limited” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

On 29th August 2011, the National Highway Authority of India (NHAI) awarded a 28-year concession (including construction period of 910 days) to BSCPL Infrastructure Limited for the strengthening, improvement, 4-laning, operation and maintenance, and tolling of 150.4kms of Chattisgarh/Orissa border-Aurang section from KM88.00 to KM239.00 on NH-6 in the State of Chhattisgarh. Under the contract, BSCPL was responsible for the design,construction, finance, operation and maintenance and strengthening of the existing 2-lane carriageway to a 4-lane highway with paved shoulders. The scope included construction of 4-lanes, including construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, service roads, road intersections, interchanges, drains, etc.The expansion project, part of National Highway Development Project Phase-IV would ease traffic congestion and give significant stimulus to trade and commerce in the entire region. BSCPL Infrastructure Limited established BSCPL Aurang Tollway Limited in September 2011, a special purpose vehicle, to implement the project. The SPV won the tender through competitive bidding, conducted by NHAI, by quoting the highest annual premium. The SPV would pay NHAI a sum of US$ 5.9mn (INR 297mn @50 INR/USD) in the first year of operations with 5% increase in each subsequent year (This amounted to an NPV payout of about US$ 90.8mn over the life of concession period at a discount rate of 10%). There were 10 final bidders for the project. The L2 bidder, Galfar-JMC consortium had quoted a premium of INR 166mn. Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession. BSCPL Infrastructure was awarded a fixed price EPC contract for this project in June 2012. The concession agreement was signed on 25th January 2012. The project attained financial closure on 28th June 2012. The debt/equity ratio for the project was 69/31. The estimated capital cost of the project at the time of financial closure was US$ 247.2mn (INR 12360mn @ 50 INR/USD) million. Financing comprised a term loan of US$ 171.2mn (INR 8560mn) and sponsor equity of US$ 76mn (INR 3800mn). The term loan was solely arranged by ICICI Bank.The other participating banks were IIFCL, Corporation Bank, Tamil Nadu Mercantile Bank Limited, State Bank of Hyderabad. Construction on the project began in February 2013 (the Appointed Date) and was expected to be completed by August 2015.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data