BSCPL Aurang Tollway Limited
Sector: Commercial • Location: India
Source: World Bank Group
On 29th August 2011, the National Highway Authority of India (NHAI) awarded a 28-year concession (including construction period of 910 days) to BSCPL Infrastructure Limited for the strengthening, improvement, 4-laning, operation and maintenance, and tolling of 150.4kms of Chattisgarh/Orissa border-Aurang section from KM88.00 to KM239.00 on NH-6 in the State of Chhattisgarh.
Under the contract, BS
- Status
- Prospective
- Sector
- Commercial, Road, Bridge, Government, Waste Processing and Treatment, Automotive
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about BSCPL Aurang Tollway Limited
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | On 29th August 2011, the National Highway Authority of India (NHAI) awarded a 28-year concession (including construction period of 910 days) to BSCPL Infrastructure Limited for the strengthening, improvement, 4-laning, operation and maintenance, and tolling of 150.4kms of Chattisgarh/Orissa border-Aurang section from KM88.00 to KM239.00 on NH-6 in the State of Chhattisgarh. Under the contract, BSCPL was responsible for the design,construction, finance, operation and maintenance and strengthening of the existing 2-lane carriageway to a 4-lane highway with paved shoulders. The scope included construction of 4-lanes, including construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, service roads, road intersections, interchanges, drains, etc.The expansion project, part of National Highway Development Project Phase-IV would ease traffic congestion and give significant stimulus to trade and commerce in the entire region. BSCPL Infrastructure Limited established BSCPL Aurang Tollway Limited in September 2011, a special purpose vehicle, to implement the project. The SPV won the tender through competitive bidding, conducted by NHAI, by quoting the highest annual premium. The SPV would pay NHAI a sum of US$ 5.9mn (INR 297mn @50 INR/USD) in the first year of operations with 5% increase in each subsequent year (This amounted to an NPV payout of about US$ 90.8mn over the life of concession period at a discount rate of 10%). There were 10 final bidders for the project. The L2 bidder, Galfar-JMC consortium had quoted a premium of INR 166mn. Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession. BSCPL Infrastructure was awarded a fixed price EPC contract for this project in June 2012. The concession agreement was signed on 25th January 2012. The project attained financial closure on 28th June 2012. The debt/equity ratio for the project was 69/31. The estimated capital cost of the project at the time of financial closure was US$ 247.2mn (INR 12360mn @ 50 INR/USD) million. Financing comprised a term loan of US$ 171.2mn (INR 8560mn) and sponsor equity of US$ 76mn (INR 3800mn). The term loan was solely arranged by ICICI Bank.The other participating banks were IIFCL, Corporation Bank, Tamil Nadu Mercantile Bank Limited, State Bank of Hyderabad. Construction on the project began in February 2013 (the Appointed Date) and was expected to be completed by August 2015. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Bridge, Government, Waste Processing and Treatment, Automotive |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in India
- Mundra Ultra Mega Power Plant Gujarat
- ONGC Tripura Power Plant
- Salaya Power Project Gujarat
- Cable-stayed bridge project in the Chambal River
- Construction services for the wellness center component of NexusPark for the Columbus Regional Health and the City of Columbus in Indiana (United States)
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- Mytrah Energy Limited- 100.3MW Savalsang Windfarm