logo
ProjectClosed

BTR House / DeDal architectes

Closed · Belgium · Last reported May 2023

Source: ArchDaily

Inside, the spaces follow one another in a work of sequence in half-levels, or rather in quarter-levels. Articulated by integrated furniture elements, the differences in floor heights make it possible to organize the living spaces in a very open way. There are very few partitions and the gradual intimacy is created by the gradual ascent of the platforms.At the level of the wooden structure of the

Status
Closed
Sector
Road, Cement, Residential, Commercial, Warehouse
Location
Belgium
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about BTR House / DeDal architectes

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “BTR House / DeDal architectes” is an infrastructure initiative in the Road sector, located in Belgium. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Inside, the spaces follow one another in a work of sequence in half-levels, or rather in quarter-levels. Articulated by integrated furniture elements, the differences in floor heights make it possible to organize the living spaces in a very open way. There are very few partitions and the gradual intimacy is created by the gradual ascent of the platforms.At the level of the wooden structure of the construction, the rear facade and most of the front facade are composed of curtain facades and cladding in wood Red Cedar. The color of the material is intended to evolve over time in shade variations that will integrate with the colors of the existing facades of the other houses on the street.Finally, at street level, the masonry and concrete structural base calls for a different treatment of the facade. To express this mineral base, the choice fell on a light tiling.This set of levels and openings of spaces is also perceptible on the facade and the materials have been chosen to take up the expression of the structure of the wood frame construction.Text description provided by the architects.Located in a street made up of townhouses, the new construction stands precisely at a significant shift in the alignments of the fronts of the buildings between the upper and lower parts of the street.Looking for integration with the existing buildings, the new volumetry plays with this misalignment difference and creates a fold in the front facade which compensates for both the depth offsets and the alignments of cornice levels.

Location

Country

Belgium

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Road, Cement, Residential, Commercial, Warehouse

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project