Buchtel Snow Fork Trailhead
Sector: Automotive • Location: Chauncey, Ohio, United States of America
Source: Dodge USA
The trailhead site is intended to have automobile entrance(s)/ exit(s) on OH SR s 78 and 685. Project site requires grading and fill for development of a gravel trailhead parking lot, new restroom facilities connected to existing sewer and water systems, new lighting, and new a shelter house with picnic tables. Additionally, the Buchtel-Snow Fork Trailhead will include a bike/pedestrian trail brid
- Status
- Prospective
- Sector
- Automotive, Water Supply and Storage, Bridge, Car parking, Waste Processing and Treatment, Mass Transit, Government, Rail, Commercial
- Location
- Chauncey, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Buchtel Snow Fork Trailhead
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The trailhead site is intended to have automobile entrance(s)/ exit(s) on OH SR s 78 and 685. Project site requires grading and fill for development of a gravel trailhead parking lot, new restroom facilities connected to existing sewer and water systems, new lighting, and new a shelter house with picnic tables. Additionally, the Buchtel-Snow Fork Trailhead will include a bike/pedestrian trail bridge across Snow Fork stream, a mixed gravel and natural surface connector trail from the trailhead... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Chauncey |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Water Supply and Storage, Bridge, Car parking, Waste Processing and Treatment, Mass Transit, Government, Rail, Commercial |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
