Buckhorn Creek Dam Removal
Sector: Water Supply and Storage • Location: Green Charter Township, Michigan, United States of America
Source: Dodge
The project is located along Northland Drive south of 207th Avenue in Green Charter Township, Mecosta County, Michigan and is owned and managed by Mecosta County Parks. The project consists of the removal of an existing stop log dam structure in Buckhorn Creek, along with a cast-in-place box culvert under the White Pine Trail. Construction of a designed channel cross section through the existing i
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Government, Bridge, Commercial, Car parking, Hydro, Steel, Metal, Automotive
- Location
- Green Charter Township, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Buckhorn Creek Dam Removal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is located along Northland Drive south of 207th Avenue in Green Charter Township, Mecosta County, Michigan and is owned and managed by Mecosta County Parks. The project consists of the removal of an existing stop log dam structure in Buckhorn Creek, along with a cast-in-place box culvert under the White Pine Trail. Construction of a designed channel cross section through the existing impoundment and a new prefabricated steel 90ft pedestrian/snowmobile bridge crossing. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Green Charter Township |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Government, Bridge, Commercial, Car parking, Hydro, Steel, Metal, Automotive |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
