logo

Buda Recypark Industrial Center / A229 + evr-Architecten

Sector: Geothermal • Location: Belgium

Source: ArchDaily

Project
Closed

Text description provided by the architects.The new logistics site of the Agence Bruxelles Propreté/ Agentschap Net Brussel located along theBrusselsCanal near the Buda Bridge, embodies a harmonious fusion of functionality, sustainability, and aesthetics. This project revitalizes an underutilized area into a modern logistics hub while perfectly integrating with its urban environment.The social bui

Project Information FAQ

Project Information

3 Q
The project “Buda Recypark Industrial Center / A229 + evr-Architecten” is an infrastructure initiative in the Geothermal sector, located in Belgium. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Text description provided by the architects.The new logistics site of the Agence Bruxelles Propreté/ Agentschap Net Brussel located along theBrusselsCanal near the Buda Bridge, embodies a harmonious fusion of functionality, sustainability, and aesthetics. This project revitalizes an underutilized area into a modern logistics hub while perfectly integrating with its urban environment.The social building houses: offices, changing rooms, and a canteen for staff, providing a functional and comfortable environment. The site's architecture enhances employee well-being. The interior spaces are bathed in natural light, ensuring superior visual, acoustic, and thermal comfort. The widespread use of wood and the quality of indoor air were prioritized, offering a healthy and pleasant working environment.The standard elements used for the industrial hall make it easy to adapt the structure in the future, by adding additional bays. A demolition inventory was also made to encourage the reuse of materials and equipment via reuse channels. A "box-in-a-box" system was introduced for the sorting cabin, offering maximum flexibility to relocate or replace this activity without the need for major renovation. In the container park, there is a recycling center, which offers space for the recovery of goods that can still be used, in this way, they can be reintegrated via channels for reuse. This sustainable project will be the reference for all future construction and renovations of theBrusselsNetwork Agency.The site is organized into four distinct strips: 1. A "Hard" strip: Designed for trucks, including parking, washing, and inspection areas. 2. "Building" strip: A unique volume visible from the canal, housing the central building and logistics halls. 3. "Green" strip: A green axis including water management elements and serving as a green filter, extending towards the canal into a public esplanade. 4. Recycling Centre (PAC) strip: A separate and publicly accessible area with separated traffic flows. The logistics halls and the sorting center are dedicated to waste management and sorting. A designated parking area is intended for the parking and maintenance of vehicles. Additionally, the recycling center (PAC) serves as a recycling area accessible to the public.In this project, preference was given to local and renewable materials, respecting the principles of the circular economy. The choice of wooden construction reduces the ecological footprint and ensures flexibility and adaptability in the future thanks to the modular design. The dry construction method used minimizes disruption on site, optimizes natural resources, and facilitates dismantling and recycling at the end of its life. Short supply chains were chosen as much as possible throughout the project. For example, thousands of m3 of soil from earthworks were transported by sea via the canal and materials were transported by boat.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data