Buda Recypark Industrial Center / A229 + evr-Architecten
Sector: Geothermal • Location: Belgium
Source: ArchDaily
Text description provided by the architects.The new logistics site of the Agence Bruxelles Propreté/ Agentschap Net Brussel located along theBrusselsCanal near the Buda Bridge, embodies a harmonious fusion of functionality, sustainability, and aesthetics. This project revitalizes an underutilized area into a modern logistics hub while perfectly integrating with its urban environment.The social bui
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Text description provided by the architects.The new logistics site of the Agence Bruxelles Propreté/ Agentschap Net Brussel located along theBrusselsCanal near the Buda Bridge, embodies a harmonious fusion of functionality, sustainability, and aesthetics. This project revitalizes an underutilized area into a modern logistics hub while perfectly integrating with its urban environment.The social building houses: offices, changing rooms, and a canteen for staff, providing a functional and comfortable environment. The site's architecture enhances employee well-being. The interior spaces are bathed in natural light, ensuring superior visual, acoustic, and thermal comfort. The widespread use of wood and the quality of indoor air were prioritized, offering a healthy and pleasant working environment.The standard elements used for the industrial hall make it easy to adapt the structure in the future, by adding additional bays. A demolition inventory was also made to encourage the reuse of materials and equipment via reuse channels. A "box-in-a-box" system was introduced for the sorting cabin, offering maximum flexibility to relocate or replace this activity without the need for major renovation. In the container park, there is a recycling center, which offers space for the recovery of goods that can still be used, in this way, they can be reintegrated via channels for reuse. This sustainable project will be the reference for all future construction and renovations of theBrusselsNetwork Agency.The site is organized into four distinct strips: 1. A "Hard" strip: Designed for trucks, including parking, washing, and inspection areas. 2. "Building" strip: A unique volume visible from the canal, housing the central building and logistics halls. 3. "Green" strip: A green axis including water management elements and serving as a green filter, extending towards the canal into a public esplanade. 4. Recycling Centre (PAC) strip: A separate and publicly accessible area with separated traffic flows. The logistics halls and the sorting center are dedicated to waste management and sorting. A designated parking area is intended for the parking and maintenance of vehicles. Additionally, the recycling center (PAC) serves as a recycling area accessible to the public.In this project, preference was given to local and renewable materials, respecting the principles of the circular economy. The choice of wooden construction reduces the ecological footprint and ensures flexibility and adaptability in the future thanks to the modular design. The dry construction method used minimizes disruption on site, optimizes natural resources, and facilitates dismantling and recycling at the end of its life. Short supply chains were chosen as much as possible throughout the project. For example, thousands of m3 of soil from earthworks were transported by sea via the canal and materials were transported by boat. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
