logo

Buenaventura Container Terminal

Sector: Road • Location: Colombia

Source: World Bank Group

Project
Active

In August 2010, Sociedad Portuaria Terminal de Contenedores de Buenaventura (TCBuen) closed financing the first phase of a new container terminal in the port of Buenaventura, the only significant Pacific coast port in Colombia. The Project involved the development, engineering, construction, dredging, equipment purchases, and operation of the terminal. The terminal was to handle 268,000 TEUs of co

Status
Prospective
Sector
Road, Seaport, Water Supply and Storage, Commercial, Warehouse, Government
Location
Colombia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Buenaventura Container Terminal

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Buenaventura Container Terminal” is an infrastructure initiative in the Road sector, located in Colombia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In August 2010, Sociedad Portuaria Terminal de Contenedores de Buenaventura (TCBuen) closed financing the first phase of a new container terminal in the port of Buenaventura, the only significant Pacific coast port in Colombia. The Project involved the development, engineering, construction, dredging, equipment purchases, and operation of the terminal. The terminal was to handle 268,000 TEUs of container traffic each year during its first phase. TCBuen was located in Buenaventura, Colombia, at the Aguacate Marsh before the Cascajal Island and directly connected to the main national road connecting Buenaventura to main cities in the country approximately 3km north-west from downtown. TCBuen was owned by Grup Maritim Terminal de Contenidors de Barcelona (GMTCB)[Spain] and Grupo Empresarial de Pacifico S.A. (GEPSA)[Colombia]. The Project was estimated to cost US $224 million. The syndication was signed August 2, 2010 and comprised US $160 million of debt and US $71 million of equity. The debt was split into $142m of senior debt and an $18m mezzanine loan provided by mandated arranger WestLB, BES and CIFI and IFC. IFC provided senior and subordinated debt with an A Loan of US $25 million, for IFC’s own account, two B Loans of US $107 million and US $10 million from a syndication banks, and a C Loan (mezzanine debt is under quasi equity according to IFC) of US $18 million. In 2013, TCBuen announced the expansion of the terminal capacity to 610,000 TEUs. The company was set to invest US$ 157.9 million, of which US$ 90 million was financed with a loan from the IFC approved in November 2013 (US$ 25 million A loan; and US$ 65 million B loan). In December 2015, APM Terminals acquired Grup Maritim TCB in a transaction valued US$ 1 billion.

Original sector

Transport

Budget

Location

Country

Colombia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Seaport, Water Supply and Storage, Commercial, Warehouse, Government

Article published date

2024-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project