logo
ProjectIn Progress

Buffalo Pound Water - Plant Renewal Project

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

The Buffalo Pound Water Plant Renewal Project will ensure the long-term viability of the Buffalo Pound Water Treatment Plant (the plant) by renewing the plant and increasing the capacity from 205 ML/day to 250 ML/day to meet the needs of the region’s forecasted potable water demands in 2050. The plant was commissioned in 1955 and supplies potable water to the Cities of Regina, Moose Jaw, and commu

Status
Under Construction
Sector
Water Supply and Storage, Power Generation (CCGT), Commercial, Government
Location
Saskatchewan, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Buffalo Pound Water - Plant Renewal Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Buffalo Pound Water - Plant Renewal Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Saskatchewan, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Buffalo Pound Water Plant Renewal Project will ensure the long-term viability of the Buffalo Pound Water Treatment Plant (the plant) by renewing the plant and increasing the capacity from 205 ML/day to 250 ML/day to meet the needs of the region’s forecasted potable water demands in 2050. The plant was commissioned in 1955 and supplies potable water to the Cities of Regina, Moose Jaw, and communities in the region of over 260,000 people as well as to SaskWater. Over the years, the plant has been upgraded and expanded with the most significant work done between 1985 and in 1989. The majority of the Water Treatment Plant has not been upgraded since that period of time. The only notable exceptions are the raw water intake and pipeline added in 2001, ultraviolet (UV) disinfection was added in 2017, backup power and electrical upgrades are currently under construction. The plant is at or near the end of its useful life. The project scope of work includes: • upgrades to the treatment process, and water treatment building; • upgrades to three clear wells; • decommissioning and repurposing of the regeneration building; • upgrades to the process waste freeze/thaw ponds; • construction of two new freeze/thaw ponds; • replacement and improvement of local and transmission piping; and • other structural, electrical, mechanical, piping, and associated works. The project will increase access to potable water for many communities and will result in a facility that meets or exceeds provincial drinking water standards. As a result of the upgrades, the capacity for the facility to treat wastewater runoff will also be increased. The project is supported by the City of Regina, City of Moose Jaw and SaskWater as well as numerous customers within the region who obtain water originating from the Buffalo Pound Water Treatment Plant.

Original sector

Drinking Water and Wastewater

Budget

Location

Country

Canada

State

Saskatchewan

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Commercial, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project