Buffalo Valley South Resurfacing, Rehabilitation and Utility Replacement
Sector: Road • Location: Schertz, Texas, United States
Source: Community Impact
The project includes water and sewer main replacements, along with street rehabilitation, in the Buffalo Valley South neighborhood of Schertz. Selected streets were chosen based on Pavement Condition Index scores for needed repairs.
- Status
- Under Construction
- Sector
- Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Government
- Location
- Schertz, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Community Impact
ConstructChat
Ask ConstructChat about Buffalo Valley South Resurfacing, Rehabilitation and Utility Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes water and sewer main replacements, along with street rehabilitation, in the Buffalo Valley South neighborhood of Schertz. Selected streets were chosen based on Pavement Condition Index scores for needed repairs. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Schertz |
Source
Source | Community Impact |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
