Building 15 Grease Trap Lining
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge
-Empty 1000-gallon grease trap tank that serves building 15. Tank is located south of Building 20. See drawings. -Power wash inside of tank to prepare for the tank liner coating. -Apply an high build epoxy lining system to the entire inside of the grease trap tank. The epoxy lining system shall be approved for use with sewer systems by the manufacturer. -Epoxy lining system shall be: oUltra-high b
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Vancouver, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Building 15 Grease Trap Lining
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | -Empty 1000-gallon grease trap tank that serves building 15. Tank is located south of Building 20. See drawings. -Power wash inside of tank to prepare for the tank liner coating. -Apply an high build epoxy lining system to the entire inside of the grease trap tank. The epoxy lining system shall be approved for use with sewer systems by the manufacturer. -Epoxy lining system shall be: oUltra-high build 100% solids epoxy coating oSolvent free oBroad range high chemical resistance oProvide struc... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Vancouver |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
