Building 258 - Tower Reconstruction
One of 9,133 projects Taiyo tracks in Maine.
Source: Dodge USA
Scope of Work Summary: Project includes the demolition and removal of the top sections of an existing 6 story steel tower to a lower elevation. Work also includes construction of a new floor and new roof for the tower, as well as siding; along with proper demolition and disposal of all materials.
- Status
- Closed
- Sector
- Commercial, Education, Steel, Government, Metal
- Location
- Bangor, Maine, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Building 258 - Tower Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of Work Summary: Project includes the demolition and removal of the top sections of an existing 6 story steel tower to a lower elevation. Work also includes construction of a new floor and new roof for the tower, as well as siding; along with proper demolition and disposal of all materials. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maine |
City | Bangor |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Education, Steel, Government, Metal |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
