Building 29 Hangar Renovations
Bidding · West Virginia · Last reported Oct 2026
Source: Dodge
Airline Terminal. Bids to Owner Public - State December 08 at 03:30 PM (EDT)
- Status
- Prospective
- Sector
- Chemical (Industrial), Water Supply and Storage, Power Generation (CCGT), Steel, Forest Products and Packaging, Metal, Consumer Products, Rail, Waste Processing and Treatment, Cement, Airport, Road, Hospital, Manufacturing (Industrial), Residential, Power Transmission, Commercial
- Location
- Charleston, West Virginia, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Building 29 Hangar Renovations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Airline Terminal. Bids to Owner Public - State December 08 at 03:30 PM (EDT) |
Original sector | Industry, Trade And Services |
Budget |
Location
Country | United States of America (USA) |
State | West Virginia |
City | Charleston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Water Supply and Storage, Power Generation (CCGT), Steel, Forest Products and Packaging, Metal, Consumer Products, Rail, Waste Processing and Treatment, Cement, Airport, Road, Hospital, Manufacturing (Industrial), Residential, Power Transmission, Commercial |
Article published date | 2026-10-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in United States of America
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- Camden Street Drain Replacement
- City of Manassas Water Treatment Plant Clearwell No. 2
- Discovery Park Chemical Toilet Replacement
- Contract for the Orinda Water Treatment Plant Disinfection and Chemical Systems Safety Improvements Project in Orinda, California (United States)
- SR 1; SR 53 & SR 341 @ 8 LOCS IN FLOYD & WALKER COUNTY
- BRIDGE PRESERVATION @ 11 SR LOCS IN DISTRICT 3
- I-75 @ 1 LOC;I-85 @ 2 LOC & I-285 @1 LOC-BRIDGE PRESERVATION
