Building 399 Water Services Phase 3
Sector: Water Supply and Storage • Location: Columbus, Georgia, United States of America
Source: Dodge USA
The Project consists of installing approximately 135 linear feet of 4-inch ductile iron water pipe, two 4-inch meter assemblies, and two 4-inch backflow preventer assemblies in the Main Post area of Fort Moore off of Wold Avenue.
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Waste Processing and Treatment, Government, Commercial, Steel
- Location
- Columbus, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Building 399 Water Services Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of installing approximately 135 linear feet of 4-inch ductile iron water pipe, two 4-inch meter assemblies, and two 4-inch backflow preventer assemblies in the Main Post area of Fort Moore off of Wold Avenue. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Columbus |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Waste Processing and Treatment, Government, Commercial, Steel |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
