Building Automation Systems Bas PM IQC
Sector: Power Generation (CCGT) • Location: Indio, California, United States of America
Source: Dodge USA
Hall of Justice 7 - Air Handlers 2 - Water cooled Chillers 1 - Air Cooled Chiller 2 - Cooling Towers 3 - Leibert split systems 2 - Split heat pump system for Lobby 1 - Mr. slim Phone room 1 - Split system main Electrical room ground floor VAV boxes 3 - Boilers 2 - Boiler pumps 2 - Chilled water pumps 2 - Condenser water pumps 4-Fan coil units in elevator machine rooms 2-split systems for server ro
- Status
- Closed
- Sector
- Power Generation (CCGT), Government, Water Supply and Storage, Residential, Manufacturing (Industrial), Commercial
- Location
- Indio, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Building Automation Systems Bas PM IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Hall of Justice 7 - Air Handlers 2 - Water cooled Chillers 1 - Air Cooled Chiller 2 - Cooling Towers 3 - Leibert split systems 2 - Split heat pump system for Lobby 1 - Mr. slim Phone room 1 - Split system main Electrical room ground floor VAV boxes 3 - Boilers 2 - Boiler pumps 2 - Chilled water pumps 2 - Condenser water pumps 4-Fan coil units in elevator machine rooms 2-split systems for server rooms Riverside - Family Law 1 - Dual compressor Chiller (roof top) 1 - Air handler roof top 2 - Sp... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Indio |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Water Supply and Storage, Residential, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
