Building Chiller Replacement Project
Sector: Commercial • Location: Thailand
Source: World Bank Group
The objectives of the Building Chiller Replacement Project for Thailand are to assist Thailand in 1) improving energy efficiency and reducing greenhouse gas emissions in the building chiller sector; and 2) reducing consumption of ozone depleting substances (ODS) required under the Montreal Protocol on Substances that Deplete the Ozone Layer.. Specifically, the project establishes preferred conditi
- Status
- Closed
- Sector
- Commercial, Government
- Location
- Thailand
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Building Chiller Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Building Chiller Replacement Project for Thailand are to assist Thailand in 1) improving energy efficiency and reducing greenhouse gas emissions in the building chiller sector; and 2) reducing consumption of ozone depleting substances (ODS) required under the Montreal Protocol on Substances that Deplete the Ozone Layer.. Specifically, the project establishes preferred conditions that facilitate early replacement of low-energy efficiency chillers using chlorofluorocarbons (CFCs) as refrigerant with high-energy efficiency non-CFC chillers. There are two project components. The first aims to demonstrate actual energy savings realized by high efficiency non-CFC chillers under the climatic conditions of Thailand by replacing approximately 24 CFC chillers and monitoring their performance. The main activities comprise final appraisal of 24 sub-projects and signing of sub-loan agreements with chiller owners; and physical replacement of the 24 chillers. The second component funds an independent evaluation consulting team, which oversees and evaluates the quality of works of all equipment suppliers at the time of dismantling the existing units and installation of new chillers. These consulting services will a) evaluate the success and lessons learned from the pilot project; b) market and promote the development of the follow-on chiller replacement program: and c) design and prepare an implementation plan. |
Original sector | FY17 - Industry, Trade and Services |
Budget |
Location
Country | Thailand |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
