Buildings 1 & 2 Roof Replace,HAZMAT Abatement & Reno Phase 3
One of 10,000+ projects Taiyo tracks in New York.
Source: Dodge USA
Sunmount Phase 3 roof replacement project intends to replace the roof of building 1, from its existing sheet metal roof to a standing seam metal roof. Building 2 is also included in the scope. The work for building 2 includes repair of low slope EPDM roofing, minor siding repair, and asphalt shingle replacement on a roof canopy. The main level roofs of building 2 are to remain in place. Also inclu
- Status
- Closed
- Sector
- Road, Metal, Residential, Commercial, Cement, Manufacturing (Industrial)
- Location
- Tupper Lake, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Buildings 1 & 2 Roof Replace,HAZMAT Abatement & Reno Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sunmount Phase 3 roof replacement project intends to replace the roof of building 1, from its existing sheet metal roof to a standing seam metal roof. Building 2 is also included in the scope. The work for building 2 includes repair of low slope EPDM roofing, minor siding repair, and asphalt shingle replacement on a roof canopy. The main level roofs of building 2 are to remain in place. Also included: 1. Masonry repair in select areas along building 1. 2. Window replacement at building 1/buil... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Tupper Lake |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Metal, Residential, Commercial, Cement, Manufacturing (Industrial) |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
