logo

Buja 25 MW Battery Energy Storage System

Sector: Energy Storage • Location: Buja, Udine, Italy

Source: ESS News

Project
Authorized

Greenstone 1 Srl, part of the Renantis Group, received authorization for a 25 MW battery energy storage system (BESS) project in the municipality of Buja (UD). The facility will include 48 prefabricated cabinets with lithium iron phosphate batteries, 8 cabinets with inverters, and 8 LV/MV transformers.

Status
Prospective
Sector
Energy Storage, Fertilizers, Metal, Steel
Location
Buja, Udine, Italy
Updated
22 Jul 2026
Source
ESS News

ConstructChat

Ask ConstructChat about Buja 25 MW Battery Energy Storage System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Buja 25 MW Battery Energy Storage System” is an infrastructure initiative in the Energy Storage sector, located in Buja, Udine, Italy. Taiyo aggregates data on it from ESS News.

Participants

Not available for this record.

Status

Original status

authorized

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Greenstone 1 Srl, part of the Renantis Group, received authorization for a 25 MW battery energy storage system (BESS) project in the municipality of Buja (UD). The facility will include 48 prefabricated cabinets with lithium iron phosphate batteries, 8 cabinets with inverters, and 8 LV/MV transformers.

Original sector

Energy Storage

Location

Country

Italy

State

Udine

City

Buja

Source

Source

ESS News

URL

More Details

Record type

Project

Sector

Energy Storage, Fertilizers, Metal, Steel

Article published date

2025-11-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project