Bulkhead Construction SOURCES SOUGHT
Sector: Water Supply and Storage • Location: Sawyer, Oklahoma, United States of America
Source: Dodge
Provide a new segmental Bulkhead Assembly that is used to block water from flowing through the tainter gate bays while the tainter gates are being serviced or inspected. The Bulkhead Assembly is comprised of six individual 51-foot-long hollow steel tubular segments, which are assembled in the reservoir to create a single bulkhead. The assembled floating bulkhead will be ballasted with water using
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Provide a new segmental Bulkhead Assembly that is used to block water from flowing through the tainter gate bays while the tainter gates are being serviced or inspected. The Bulkhead Assembly is comprised of six individual 51-foot-long hollow steel tubular segments, which are assembled in the reservoir to create a single bulkhead. The assembled floating bulkhead will be ballasted with water using mechanical pumps and rotated to a vertical orientation for placement against the tainter gate pie... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
