logo
ProjectStart

Bull Creek Fish Camp Restaurant Redevelopment

Start · Florida · Last reported Aug 2025

Source: Dodge

This project consists of the design and construction of a 4,000 sq. ft. restaurant facility with a screened porch, repairs to a seawall, installation of a floating dock, and relocation of a septic drain field.

Status
Prospective
Sector
Government, Consumer Products, Raw Materials, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
Location
Bunnell, Florida, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Bull Creek Fish Camp Restaurant Redevelopment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bull Creek Fish Camp Restaurant Redevelopment” is an infrastructure initiative in the Government sector, located in Bunnell, Florida, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

This project consists of the design and construction of a 4,000 sq. ft. restaurant facility with a screened porch, repairs to a seawall, installation of a floating dock, and relocation of a septic drain field.

Budget

Location

Country

United States of America (USA)

State

Florida

City

Bunnell

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Consumer Products, Raw Materials, Commercial, Manufacturing (Industrial), Waste Processing and Treatment

Article published date

2025-08-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project