Bull Run Wind Energy Center
Sector: Power Generation (CCGT) • Location: Ellenburg Center, New York, United States of America
Source: Dodge
50-100 wind turbines - collection substation, an overhead 230 kV electrical line and an interconnection substation, which will interconnect with New York Power Authoritys 230kV transmission line inthe Town of Ellenburg. It is anticipated that the newly constructed 230kV line will be approximately 4 miles in length. 449 megawatt MW wind-powered electric generation project. The Project components ar
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Wind
- Location
- Ellenburg Center, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Bull Run Wind Energy Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 50-100 wind turbines - collection substation, an overhead 230 kV electrical line and an interconnection substation, which will interconnect with New York Power Authoritys 230kV transmission line inthe Town of Ellenburg. It is anticipated that the newly constructed 230kV line will be approximately 4 miles in length. 449 megawatt MW wind-powered electric generation project. The Project components are proposed to include the installation and operation of up to 150 wind turbines in the Towns of A... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Ellenburg Center |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Wind |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
