Bull Swamp Water System Improvements Division III
Sector: Water Supply and Storage • Location: Orangeburg, South Carolina, United States of America
Source: Dodge USA
The work to be done consists of furnishing all materials, equipment and labor necessary to construct Division III Bull Swamp Water System Improvements, consisting of the following approximate quantities: Redmond Mill Road, Magenta Drive, Jimmy Road Water Main: 24,095 LF of 8 DIP Water Main, 1,797 LF of 8 RJ DIP Water Main, 31 LF of 8 RJ DIP Water Main Installed in Casing, 35 LF of 6 RJ DIP Water M
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Road, Waste Processing and Treatment, Manufacturing (Industrial)
- Location
- Orangeburg, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bull Swamp Water System Improvements Division III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be done consists of furnishing all materials, equipment and labor necessary to construct Division III Bull Swamp Water System Improvements, consisting of the following approximate quantities: Redmond Mill Road, Magenta Drive, Jimmy Road Water Main: 24,095 LF of 8 DIP Water Main, 1,797 LF of 8 RJ DIP Water Main, 31 LF of 8 RJ DIP Water Main Installed in Casing, 35 LF of 6 RJ DIP Water Main, 1,050 LF of 10 HDPE Water Main installed by Horizontal Directional Drill, Valves, Fittings, ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Orangeburg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Road, Waste Processing and Treatment, Manufacturing (Industrial) |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
