logo

Bullshead Reservoir - Spillway Drain Rehabilitation

Sector: Commercial • Location: Edmonton, Alberta, Canada

Source: Dodge USA

Project
Bid Results

BULLSHEAD RESERVOIR Spillway Drain Rehabilitation Major Capital Projects APPROXIMATE QUANTITIES: 1 Lump sum Existing and Temporary Roads 1 Lump sum Removal, Disposal and Abandonment of Existing CMP Drain 250 M3 Topsoil Stripping 400 M3 Common Excavation 400 M3 Impervious Fill Zone 1A 200 Tonnes Fine Filter Zone 3A 160 Tonnes Coarse Filter Zone 3B 30 Tonnes Road Gravel Zone 4B 30 Tonnes Riprap Zone

Status
Closed
Sector
Commercial, Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Mass Transit, Automotive, Rail
Location
Edmonton, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bullshead Reservoir - Spillway Drain Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bullshead Reservoir - Spillway Drain Rehabilitation” is an infrastructure initiative in the Commercial sector, located in Edmonton, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

BULLSHEAD RESERVOIR Spillway Drain Rehabilitation Major Capital Projects APPROXIMATE QUANTITIES: 1 Lump sum Existing and Temporary Roads 1 Lump sum Removal, Disposal and Abandonment of Existing CMP Drain 250 M3 Topsoil Stripping 400 M3 Common Excavation 400 M3 Impervious Fill Zone 1A 200 Tonnes Fine Filter Zone 3A 160 Tonnes Coarse Filter Zone 3B 30 Tonnes Road Gravel Zone 4B 30 Tonnes Riprap Zone 6B 35 M Supply and Install 100 Slotted Fusible PVC Collector Pipe 30 M Supply and Install 150 No...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Edmonton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Mass Transit, Automotive, Rail

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project