Bumbuna Phase II Hydro-electric Project - Sierra Leone
Sector: Government • Location: Sierra Leone
Source: European Union Africa Infrastructure Trust Fund
The Project involves an increase in the capacity of the Bumbuna Hydro-electric project in Sierra Leone from 50MW by 322 MW to 372 MW by a combination of modifications to the existing dam and the construction of a 2nd dam 32 km upstream. The Upgrading of Bumbuna combined with the implementation of the CLSG line being sponsored by EU Africa ITF is ranked number 15 among the agreed Regional Priority
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under disbursement |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project involves an increase in the capacity of the Bumbuna Hydro-electric project in Sierra Leone from 50MW by 322 MW to 372 MW by a combination of modifications to the existing dam and the construction of a 2nd dam 32 km upstream. The Upgrading of Bumbuna combined with the implementation of the CLSG line being sponsored by EU Africa ITF is ranked number 15 among the agreed Regional Priority Projects of the "Update for the ECOWAS Revised Master Plan for the Generation and Transmission of Electrical Energy - Final Report - Volume 4: Executive Summary" of October 2011 in respect of the West African Power Pool ("WAPP"). Bumbuna is recognised as a Phase 1 priority project in the WAPP Masterplan, to be implemented by 2017. Phase 1 projects are defined in the Master Plan as those important for implementation of the WAPP master plan to ensure adequate load supply in the WAPP and the ECOWAS region. The Project will also increase the generation capacity of Sierra Leone by 537%, as the existing 50 MW Bumbuna dam already constitutes 80% of grid connected power in Sierra Leone. While a portion of the Bumbuna electricity is anticipated to be supplied within Sierra Leone, a significant percentage is anticipated to be exported via the CLSG interconnector, which is to connect to/at Bumbuna it will be contribute to regional electricity supplies and ECOWAS WAPP load supply. The EU-AITF technical assistance funding is used to cover technical, financial, legal, environmental and social impact and insurance advisory services to the Government of Sierra Leone for its interaction with private sector project developers and for the completion of the project, as well as a small amount for scoping of dispatch system requirements and grant administration. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |