Bunker Hill Golf Course Irrigation Project - Phase 3
Sector: Water Supply and Storage • Location: Dubuque, Iowa, United States of America
Source: Dodge USA
Furnish and install all Phase 3 golf course irrigation plumbing and distribution system design components (Holes: 1, 5, 6, 7, 8, 10, 11, 12, and 13) as shown on the drawings and specified herein. The existing Toro OSMAC Irrigation Control System and satellite controllers shall be preserved. The project includes connections to existing pressurized water supply, all electrical equipment and connecti
- Status
- Closed
- Sector
- Water Supply and Storage, Telecommunications, Government, Raw Materials, Commercial, Car parking, Power Generation (CCGT), Automotive
- Location
- Dubuque, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bunker Hill Golf Course Irrigation Project - Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Furnish and install all Phase 3 golf course irrigation plumbing and distribution system design components (Holes: 1, 5, 6, 7, 8, 10, 11, 12, and 13) as shown on the drawings and specified herein. The existing Toro OSMAC Irrigation Control System and satellite controllers shall be preserved. The project includes connections to existing pressurized water supply, all electrical equipment and connections from the satellite controllers to the new irrigation heads as required to provide a complete ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Dubuque |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Telecommunications, Government, Raw Materials, Commercial, Car parking, Power Generation (CCGT), Automotive |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
