Bunker Streets Asphalt Overlay & Drainage Improvments
Sector: Water Supply and Storage • Location: Bunker, Missouri, United States of America
Source: Dodge
This project includes overlaying city streets and paving gravel streets. This project includes approximately 16,650 SY surface preparation, 105 SY gravel surfacing, 2,500 SY 2" asphalt pavement, 20,025 SY 3" asphalt pavement, 590 GA tack, and 5 utilities to be adjusted.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Raw Materials, Road, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Commercial
- Location
- Bunker, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Bunker Streets Asphalt Overlay & Drainage Improvments
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes overlaying city streets and paving gravel streets. This project includes approximately 16,650 SY surface preparation, 105 SY gravel surfacing, 2,500 SY 2" asphalt pavement, 20,025 SY 3" asphalt pavement, 590 GA tack, and 5 utilities to be adjusted. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Bunker |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Raw Materials, Road, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Commercial |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
