Burbank Pump Station 1 Rehabilitation
Sector: Water Supply and Storage • Location: Burbank, California, United States of America
Source: Dodge
Planned rehabilitation of the booster pumps at the recycled water Pump Station 1 (PS1). PS1 is the recycled water system's primary pump station. Existing pumps will be 15 years old in FY 2025-26 and should be evaluated to maintain reliability and efficiencies.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial
- Location
- Burbank, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Burbank Pump Station 1 Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Planned rehabilitation of the booster pumps at the recycled water Pump Station 1 (PS1). PS1 is the recycled water system's primary pump station. Existing pumps will be 15 years old in FY 2025-26 and should be evaluated to maintain reliability and efficiencies. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Burbank |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
