logo

Burgos Llocos Norte Wind Farm

Sector: Warehouse • Location: Philippines

Source: World Bank Group

Project
Active

EDC Burgos Wind Power Corporation (EBWPC) was created to build, own and operate an 87 MW wind farm to be located in Llocos Norte, the Philippines. The output of the power plant was expected to be sold at the premium feed-in tariff paid for eligible wind farm projects.

EBWPC was a wholly-owned subsidiary of the Philippine Developer, Energy Development Corporation.

The total cost of the project

Status
Prospective
Sector
Warehouse, Wind, Raw Materials, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Philippines
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Burgos Llocos Norte Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Burgos Llocos Norte Wind Farm” is an infrastructure initiative in the Warehouse sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

EDC Burgos Wind Power Corporation (EBWPC) was created to build, own and operate an 87 MW wind farm to be located in Llocos Norte, the Philippines. The output of the power plant was expected to be sold at the premium feed-in tariff paid for eligible wind farm projects. EBWPC was a wholly-owned subsidiary of the Philippine Developer, Energy Development Corporation. The total cost of the project was estimated at USD 300 million which covered the costs of the wind farm, substation and transmission line. The project reached financial close in April 2013 after EDC signed a USD 80 million loan facility. The lead arrangers for the loan transaction were Mizuho Corporate Bank, Ltd and Sumitomo Mitsui Banking Corporation. EBWPC began construction in April 2013 and the power plant was scheduled for commissioning in 2014. EDC had selected the Danish wind turbine manufacturer Vestas to supply the plant's wind turbines. The plant comprised 29 of Vestas' V90 3-MW turbines, and is projected to generate an average of about 233 GWh a year. http://www.evwind.es/noticias.php?id_not=10930 http://thinkgeoenergy.com/archives/7674 http://business.inquirer.net/58415/edc-sets-aside-p20b-for-projects-in-2012

Original sector

Energy

Budget

Location

Country

Philippines

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Warehouse, Wind, Raw Materials, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project