Burgos Llocos Norte Wind Farm
Sector: Warehouse • Location: Philippines
Source: World Bank Group
EDC Burgos Wind Power Corporation (EBWPC) was created to build, own and operate an 87 MW wind farm to be located in Llocos Norte, the Philippines. The output of the power plant was expected to be sold at the premium feed-in tariff paid for eligible wind farm projects.
EBWPC was a wholly-owned subsidiary of the Philippine Developer, Energy Development Corporation.
The total cost of the project
- Status
- Prospective
- Sector
- Warehouse, Wind, Raw Materials, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
- Location
- Philippines
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Burgos Llocos Norte Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | EDC Burgos Wind Power Corporation (EBWPC) was created to build, own and operate an 87 MW wind farm to be located in Llocos Norte, the Philippines. The output of the power plant was expected to be sold at the premium feed-in tariff paid for eligible wind farm projects. EBWPC was a wholly-owned subsidiary of the Philippine Developer, Energy Development Corporation. The total cost of the project was estimated at USD 300 million which covered the costs of the wind farm, substation and transmission line. The project reached financial close in April 2013 after EDC signed a USD 80 million loan facility. The lead arrangers for the loan transaction were Mizuho Corporate Bank, Ltd and Sumitomo Mitsui Banking Corporation. EBWPC began construction in April 2013 and the power plant was scheduled for commissioning in 2014. EDC had selected the Danish wind turbine manufacturer Vestas to supply the plant's wind turbines. The plant comprised 29 of Vestas' V90 3-MW turbines, and is projected to generate an average of about 233 GWh a year. http://www.evwind.es/noticias.php?id_not=10930 http://thinkgeoenergy.com/archives/7674 http://business.inquirer.net/58415/edc-sets-aside-p20b-for-projects-in-2012 |
Original sector | Energy |
Budget |
Location
Country | Philippines |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Warehouse, Wind, Raw Materials, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Warehouse projects in Philippines
- BacMan Geothermal Power Plant
- Bauan Terminal
- Burgos Llocos Norte Wind Farm
- Subic Bay Grain Terminal
- EDC Palinpinon II Geothermal Plant
- Ninoy Aquino International Airport Terminal 3
- San Fernando Port RoRo Upgrade
- Port of Manila: Contract for the Management, Operation and Development of Manila International Container Terminal (MICT)
