logo

Burkina Faso - Electrification of Semi-Urban Areas of Ouagadougou and Bobo-Dioulasso Project

Sector: Power Generation (CCGT) • Location: Burkina Faso

Source: African Development Bank (AfDB)

Project
Implementation

The electrification project for semi-urban areas in Ouagadougou and Bobo-Dioulasso (PEPU) is an investment operation that seeks to expand the electrical networks and establish electrical connections in these two towns. The project is largely based on the Ouagadougou Power Networks Restructuring and Extension Study conducted in 2015. The study proposed appropriate technical solutions for better str

Project Information FAQ

Project Information

5 Q
The project “Burkina Faso - Electrification of Semi-Urban Areas of Ouagadougou and Bobo-Dioulasso Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Burkina Faso. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

implementation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The electrification project for semi-urban areas in Ouagadougou and Bobo-Dioulasso (PEPU) is an investment operation that seeks to expand the electrical networks and establish electrical connections in these two towns. The project is largely based on the Ouagadougou Power Networks Restructuring and Extension Study conducted in 2015. The study proposed appropriate technical solutions for better structuring of the Ouagadougou power network and best options for its expansion to satisfy the steadily-growing demand in semi-urban areas. The project aims to restructure and expand the medium and lowvoltage distribution networks in the country’s two largest towns, install transformer substations, and establish 17,500 connections to households. It also comprises several activities intended to strengthen SONABEL’s operational capacity through the procurement of logistic resources, operating equipment, and electricity calculation software, as well as through the training of field workers and staff in charge of conducting studies. Implementation will span a period of 48 months from 2017 to 2020.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data