Burkina Faso - Electrification of Semi-Urban Areas of Ouagadougou and Bobo-Dioulasso Project
Sector: Power Generation (CCGT) • Location: Burkina Faso
Source: African Development Bank (AfDB)
The electrification project for semi-urban areas in Ouagadougou and Bobo-Dioulasso (PEPU) is an investment operation that seeks to expand the electrical networks and establish electrical connections in these two towns. The project is largely based on the Ouagadougou Power Networks Restructuring and Extension Study conducted in 2015. The study proposed appropriate technical solutions for better str
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | implementation |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The electrification project for semi-urban areas in Ouagadougou and Bobo-Dioulasso (PEPU) is an investment operation that seeks to expand the electrical networks and establish electrical connections in these two towns. The project is largely based on the Ouagadougou Power Networks Restructuring and Extension Study conducted in 2015. The study proposed appropriate technical solutions for better structuring of the Ouagadougou power network and best options for its expansion to satisfy the steadily-growing demand in semi-urban areas. The project aims to restructure and expand the medium and lowvoltage distribution networks in the country’s two largest towns, install transformer substations, and establish 17,500 connections to households. It also comprises several activities intended to strengthen SONABEL’s operational capacity through the procurement of logistic resources, operating equipment, and electricity calculation software, as well as through the training of field workers and staff in charge of conducting studies. Implementation will span a period of 48 months from 2017 to 2020. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
