Burkina Faso - Project Integrated studies for the development of the Naré underground dam and the rehabilitation of related infrastructures
Sector: Water Supply and Storage • Location: Burkina Faso
Source: African Development Bank (AfDB)
This project is a technical assistance for in-depth studies of the capacity of the Naré dam and the vulnerability of groundwater resources to climate change. The project aims to: (i) produce scientific and technical knowledge on the characteristics of a groundwater dam, the potential for scaling up or sharing project results; (ii) prepare investments in a framework for adapting to climate change r
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project is a technical assistance for in-depth studies of the capacity of the Naré dam and the vulnerability of groundwater resources to climate change. The project aims to: (i) produce scientific and technical knowledge on the characteristics of a groundwater dam, the potential for scaling up or sharing project results; (ii) prepare investments in a framework for adapting to climate change resilience and mitigating environmental impacts; and (iii) make small-scale investments (water supply, irrigated area) that will create jobs, income and improve local populations' access to drinking water. Its implementation will allow the efficient and sustainable exploitation of groundwater for multiple uses in the relevant Sahel region of the country and will contribute significantly to the reduction of soil degradation and vegetation cover. It is carried out by the General Directorate of Water Resources (DGRE) for a provisional period of 25 months. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
