Burkina Faso - Upgrading of Access Roads Project
Sector: Raw Materials • Location: Burkina Faso
Source: African Development Bank (AfDB)
The project involves the construction and surfacing of National Roads No. 10, running between Dédougou and Tougan (91 km), and No. 22, running between Kongoussi and Djibo (96 km), which are classified as roads providing access to the country’s interior. The rationale for this project and its urgent implementation relates to the inadequacy and high level of deterioration of the road network in the
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves the construction and surfacing of National Roads No. 10, running between Dédougou and Tougan (91 km), and No. 22, running between Kongoussi and Djibo (96 km), which are classified as roads providing access to the country’s interior. The rationale for this project and its urgent implementation relates to the inadequacy and high level of deterioration of the road network in the targeted regions. The two sections identified, which at present are all-purpose earth roads in very bad condition, provide access to high agricultural and livestock production regions which contribute significantly to the country’s food security. The two project roads pass through five provinces of Burkina Faso (Soum, Bam, Mouhoun, Nayala and Sourou) belonging to three regions (Boucle du Mouhoun, Centre-North and Sahel). These roads play a key role in the strategy to open up the country. The project will be implemented over a 64-month period and its total cost, net of taxes and custom duties and including physical contingencies and price escalation, is estimated at UA 100.674 million. The expected project outcomes are: (i) reduction of generalized transport costs; (ii) improvement in the living conditions of the population and in access to basic services; and (iii) institutional capacity building in road sub-sector management. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
