Burleson Police Department Expansion & Renovation
Sector: Water Supply and Storage • Location: Burleson, Texas, United States of America
Source: Dodge
This Early Release Package will include: Phase 1 Div 02 - Selective Building Demolition at the Municipal Courts Building Div 03 - Site Paving parking paving only; sidewalks to be included in main construction package Div 05 - Structural&Misc. Steel - ENTIRE PROJECT refer to bid form for bidding instructions Div 22 - Site gas line under paving Div 26 - Electrical site underground conduits&pathways
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Car parking, Automotive, Government, Steel, Metal, Manufacturing (Industrial), Commercial
- Location
- Burleson, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Burleson Police Department Expansion & Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | sub bidding, construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Early Release Package will include: Phase 1 Div 02 - Selective Building Demolition at the Municipal Courts Building Div 03 - Site Paving parking paving only; sidewalks to be included in main construction package Div 05 - Structural&Misc. Steel - ENTIRE PROJECT refer to bid form for bidding instructions Div 22 - Site gas line under paving Div 26 - Electrical site underground conduits&pathways for Divisions 26/27/28, sleeves for irrigation; purchase/furnish only of: Genset&ATS and switchge... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Burleson |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Car parking, Automotive, Government, Steel, Metal, Manufacturing (Industrial), Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
