Burlington Coat Factory Fit-out - Waterbury, CT
One of 10,000+ projects Taiyo tracks in Connecticut.
Source: Dodge
Interior Tenant Improvements and Exterior Facade Refresh of an existing 24,291 sq.ft., 1 story tenant space. existing shell building is exterior SMU bearing wall and steel frame construction, and is fully sprinklered
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Waste Processing and Treatment, Commercial, Manufacturing (Industrial), Metal
- Location
- Waterbury, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Burlington Coat Factory Fit-out - Waterbury, CT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Interior Tenant Improvements and Exterior Facade Refresh of an existing 24,291 sq.ft., 1 story tenant space. existing shell building is exterior SMU bearing wall and steel frame construction, and is fully sprinklered |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Waterbury |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Waste Processing and Treatment, Commercial, Manufacturing (Industrial), Metal |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
